Two Ways to Integrate ParcelLift. One Dedicated Parcel Infrastructure Solution.
Every building has its own architectural layout and structural characteristics. ParcelLift works with developers, architects and engineering teams to develop suitable internal or external building integration plans.
BUILDING HEIGHT FLEXIBILITY · 2 TO 100 FLOORS
A vertical parcel system for different building scales.
From compact two-floor properties to high-rise developments of up to 100 floors, ParcelLift is conceived as a configurable building-integrated parcel transportation system. Internal and external integration approaches can be considered according to the building's architecture and engineering requirements.
Low-rise
Compact independent residences, villas and boutique low-rise buildings seeking discreet vertical parcel movement from ground intake to upper floors.
Mid-rise
Contemporary apartment developments reducing routine delivery traffic across shared passenger lifts and residential corridors.
High-rise
Multi-storey residential, commercial and mixed-use towers coordinating dedicated vertical parcel movement with structural and MEP planning.
Tall buildings
Large-scale high-rise developments requiring project-specific drive, structural, shaft and power-architecture engineering.
Application categories for architectural planning. Each project requires a building-specific assessment of structural arrangement, available space, travel height, access, mechanical configuration, power architecture and operating requirements.
Your Building. Your Architecture. A ParcelLift Integration Plan.
Whether you are planning a new high-rise development or looking to introduce dedicated parcel infrastructure into an existing building, ParcelLift can be explored through internal and external integration approaches.
Our team works with developers, architects and engineering consultants to understand the building, evaluate available space and structural conditions, and develop a suitable project-specific integration proposal.
Every building is different. We work with your project team to determine how ParcelLift can be integrated into it.
Option 01 · InternalIntegrate ParcelLift Within the Building
We work with developers and architects to incorporate ParcelLift into the building's internal layout, coordinating shaft location, floor interfaces, structural provisions and MEP requirements.
- 1,000 × 1,000 mm clear internal shaft — V4 planning reference
- Structural opening, rails, brackets & landing interface coordination
- New residential and commercial high-rise developments
- Projects where internal shaft space and maintenance access can be coordinated
Option 02 · ExternalExplore an External ParcelLift Structure
For buildings where ParcelLift can be installed as a dedicated external structure, we develop an integration plan around the building façade, structural support requirements, floor access and available site space.
- Built on the same V4 carriage & guide-rail planning basis
- Total external structure, façade supports, brackets & foundation sized per building
- Existing and occupied residential or commercial towers
- Developments planned with dedicated exterior vertical risers
Our team assesses internal and external installation requirements with your project consultants and prepares a building-specific technical and commercial proposal.
POWER RESILIENCE
Designed with backup power capability.
ParcelLift's power architecture can incorporate battery backup to support essential controls, communication and defined emergency functions during building power interruptions. Backup capacity and operating capability are configured according to the project requirements and selected drive architecture.
- Reduced dependence on uninterrupted building power for supported essential functions
- Battery backup for essential electronic controls and communication
- A defined strategy for safe system response during building power interruptions
- Potential for controlled recovery operations, subject to the approved drive and safety architecture
Distinction between normal building power and battery-backed essential system functions.
Stationary building electrical supply powers primary vertical drive, landing interfaces, and routine parcel transport operations.
Supports selected electronic controls, communication, status indication, and defined recovery functions during power interruptions, subject to selected engineering configuration.
Battery health monitoring, charging management, and safe response protocols for low battery, charging faults, or building power loss.
Illustrative power architecture. Backup scope, charging strategy, and controlled emergency recovery capability are configured per building according to the approved drive and safety engineering design.
BUILDING TYPOLOGIES
Built for Residential, Commercial & Mixed-Use High-Rises
ResidentialHigh-Rise Residential Buildings
Multi-storey residential towers managing continuous daily e-commerce, grocery, and quick-commerce deliveries independently of passenger elevators.
- Dedicated vertical path for routine parcel deliveries
- Controlled ground-level courier intake separate from residential corridors
- Direct floor-level resident collection via OTP with no corridor storage lockers
CommercialCommercial Buildings
Office towers requiring controlled mailroom-to-floor parcel movement without issuing temporary visitor passes for routine courier drop-offs.
- Separates routine parcel movement from tenant and visitor passenger lifts
- Controlled ground-level intake coordinated with reception or security
- Authenticated floor-level handover via dynamic OTP
Mixed-UseMixed-Use Developments
Urban mixed-use developments maintaining clear operational separation between ground-level retail/service activity and upper residential or office floors.
- Physical separation between retail/service intake and upper-floor corridors
- Keeps routine delivery personnel out of residential lift lobbies
- Coordinated across podium and tower floor plates
Dedicated Shaft Planning
Early core allocation using the 1,000 × 1,000 mm clear internal shaft — V4 planning reference, aligned across served floors. Structural opening dimensions and overall installation footprint are coordinated separately per building.
Floor Landing Interface
Corridor-facing interlocked landing door positioned flush with lobby finishes so corridor circulation and egress widths are respected.
Structural Coordination
Guide-rail wall-anchoring provisions, shaft enclosure material (masonry, RCC, or fire-rated partition), and pit/headroom clearances reviewed with structural consultants.
Electrical & Control Provisions
Dedicated building power feed stepped to a 24V DC electrical and control architecture where applicable, plus provisions for backup power and maintenance isolation.
Security & Access Control
Controlled ground-level courier intake separated from residential corridors, with OTP-based resident collection at floor landings.
Architectural & MEP Coordination
Coordinating shaft placement alongside elevator cores, service risers, fire compartmentation, and lobby reception workflows during schematic design.
Site-Specific Engineering:Final shaft dimensions, structural anchor loads, fire-rating details, and electrical provisions depend on building configuration, local codes, and engineering assessment.
Read Planning Guide →ParcelLift V4 uses an indicative 1,000 × 1,000 mm clear internal shaft planning envelope. Final shaft dimensions, structural openings, guide-rail positions, landing interfaces and installation clearances are established through project-specific engineering and building assessment.
From Building Registration to a Project-Specific Proposal
Both Internal and External Building Integration follow the same structured four-stage engagement — giving your project team clear technical and commercial visibility.
Register Your Building
Builders, developers, housing societies or authorised representatives register their project with building details, floors, towers, project stage, and integration interest.
Our Team Connects With You
After registration, our team connects directly with you to understand your building, project requirements, internal or external integration direction, available drawings, and relevant site conditions.
Building Assessment
Our team evaluates the architectural, structural, and MEP information provided — with a site visit where required:
- Architectural: site plan, ground-floor & typical floor plans, sections, elevations, shaft, staircase & lobby layouts
- Structural: structural grid, column & beam arrangements, support locations, attachment & foundation/ground-level conditions
- Electrical & MEP: electrical supply, cable routing, controls & communication provisions, service access, fire & life-safety coordination
- Site visit arranged where required — assessment depth scales to your building, stage, and available information
Project-Specific Proposal
Following the assessment, ParcelLift submits a project-specific technical and commercial proposal covering:
- Recommended internal or external integration arrangement
- Architectural placement & shaft or external structure configuration
- Floor interface arrangement & operational approach
- Structural, electrical & MEP coordination requirements
- Project scope, responsibilities & implementation plan
- Commercial proposal, relevant drawings & supporting visualisations
Where the nature of a project requires it, a miniature model, physical representation, additional 3D visualisation, or project-specific engineering study may also be prepared as part of the proposal stage.
Information & Drawings Reviewed During Assessment
You do not need to prepare a separate ParcelLift engineering package to register. Share basic project details to begin — our team will guide you on the relevant drawings once we connect.
Architectural Information
- —Site plan
- —Ground-floor plan
- —Typical floor plans
- —Building sections & elevations
- —Available shaft or service-space information
- —Staircase and lobby layouts
Structural Information
- —Structural grid
- —Column and beam arrangements
- —Potential support locations
- —Building attachment considerations
- —Foundation and ground-level conditions for external integration
Electrical & MEP Information
- —Electrical supply information
- —Cable routing
- —Controls and communication provisions
- —Service and maintenance access
- —Relevant fire and life-safety coordination
08 / Developer Planning Tool
Building Parcel Demand Estimator
Estimate daily and peak-window parcel arrival volumes for your building to support early architectural and operational planning.
Share of daily parcels arriving during peak hours.
Duration of the selected peak arrival window.